Selur's Little Message Board
general settings: Threads switches from 54 to 17 when adding a clip - Printable Version

+- Selur's Little Message Board (https://forum.selur.net)
+-- Forum: Hybrid - Support (https://forum.selur.net/forum-1.html)
+--- Forum: Problems & Questions (https://forum.selur.net/forum-3.html)
+--- Thread: general settings: Threads switches from 54 to 17 when adding a clip (/thread-4333.html)



general settings: Threads switches from 54 to 17 when adding a clip - Bartoloni - 22.02.2026

general settings: Threads switches from 54 to 17 when adding a clip

as title says... why this happens? 

https://www.wcn.it/th.mp4


RE: general settings: Threads switches from 54 to 17 when adding a clip - Selur - 22.02.2026

I would say: "x264->Misc->Main->Adjustments->Limit threads by height" is probably enabled.
read the tool-tip and https://forum.doom9.org/showthread.php?p=1646307
=> that many threads make no sense

Cu Selur


RE: general settings: Threads switches from 54 to 17 when adding a clip - Bartoloni - 23.02.2026

thank you very much to point me to the discussion Smile

i just disabled the hyperthreading (from 54 to 36 threads)... leave to 17 threads that make sense usign the formula on doom9 forum...
and right now my processed frames are 104/s ... (before--> 89/s) this make my workjob a little bit faster Smile (just a tqgmc and mcdegrainsharp)