26.09.2024, 15:53
(26.09.2024, 15:34)Selur Wrote:Quote:Sometimes I start a job just to see the estimated bitrate and/or file size, and then remove it (and it can also concern failed jobs)No, to Hybrid this is the same as a job crash.
Is this something that you would change ?
In which case, Hybrid does not delete stuff, so the user can decide what to do with it. Would be a share if you encoded 10days, the muxing crashed, and you would have to do the whole encoding again,...
Cu Selur
Ah OK, so if Hybrid behave the same for manual job removal and crashes, I understand that it should be kept like that, I myself need to keep crashed jobs sometimes if I don't need the whole video. Thanks for your answer.