26.10.2025, 15:19
Quote: Limiting the number of parallel processed is enough, but what about enabling also "Parallel subjob processing", this additional option may interfere with the parallel process on chunks ?
"Parallel subjob processing" limits the number of parallel processed sub jobs, since each chunk is a sub job this already does what you want.
----
Dev versions are in the 'experimental'-folder of my GoogleDrive, which is linked on the download page.
Dev versions are in the 'experimental'-folder of my GoogleDrive, which is linked on the download page.

