Yesterday, 15:02
Hi Selur,
I noticed a minor issue with the progress indicator in the job queue of Hybrid 2026.11.26.1 (Linux AppImage).
Immediately after a job has completed successfully, both the main job and all its subjobs display 100% progress and the status FINISHED.
However, after closing and restarting Hybrid, the overall progress of the completed job is displayed as less than 100%, even though the main job and all its subjobs still have the status FINISHED.
Steps to reproduce:
Test results:
Encoder
Subjobs
Before restart
After restart
SVT-AV1
16
100%
93.75%
x265
18
100%
94.44%
SVT-AV1
19
100%
94.74%
The third job was created and completed using Hybrid 2026.11.26.1 to rule out an issue related exclusively to job queue data inherited from an earlier version.
Interestingly, all three percentages correspond exactly to the following calculation (rounded to two decimal places):
This might indicate an off-by-one error when saving or restoring the job progress, possibly related to a zero-based subjob index.
I also noticed that the individual progress percentages of the subjobs are no longer displayed after restarting Hybrid, although their FINISHED status is preserved.
Expected behaviour:
Successfully completed jobs should continue to display 100% progress after restarting Hybrid.
Actual behaviour:
Successfully completed jobs display less than 100% progress after restarting Hybrid, despite all subjobs being marked as FINISHED.
Environment:
I have attached screenshots showing the newly created 19-subjob encoding job immediately after completion and after restarting Hybrid.
This appears to be a cosmetic issue rather than an encoding failure.
Thanks for your work on Hybrid!
Best regards
tamo_bln
![[Image: Bildschirmfoto-vom-2026-11-26-13-36-29.png]](https://i.postimg.cc/CnFDYV6B/Bildschirmfoto-vom-2026-11-26-13-36-29.png)
I noticed a minor issue with the progress indicator in the job queue of Hybrid 2026.11.26.1 (Linux AppImage).
Immediately after a job has completed successfully, both the main job and all its subjobs display 100% progress and the status FINISHED.
However, after closing and restarting Hybrid, the overall progress of the completed job is displayed as less than 100%, even though the main job and all its subjobs still have the status FINISHED.
Steps to reproduce:
- Add an encoding job to the queue.
- Start the job and wait until all subjobs have finished.
- Verify that the overall progress is 100%.
- Close Hybrid normally.
- Restart Hybrid and open the job queue.
- Check the progress of the previously completed job.
Test results:
Encoder
Subjobs
Before restart
After restart
SVT-AV1
16
100%
93.75%
x265
18
100%
94.44%
SVT-AV1
19
100%
94.74%
The third job was created and completed using Hybrid 2026.11.26.1 to rule out an issue related exclusively to job queue data inherited from an earlier version.
Interestingly, all three percentages correspond exactly to the following calculation (rounded to two decimal places):
Progress = ((number of subjobs - 1) / number of subjobs) * 100This might indicate an off-by-one error when saving or restoring the job progress, possibly related to a zero-based subjob index.
I also noticed that the individual progress percentages of the subjobs are no longer displayed after restarting Hybrid, although their FINISHED status is preserved.
Expected behaviour:
Successfully completed jobs should continue to display 100% progress after restarting Hybrid.
Actual behaviour:
Successfully completed jobs display less than 100% progress after restarting Hybrid, despite all subjobs being marked as FINISHED.
Environment:
- Hybrid 2026.11.26.1 (Linux AppImage)
- Fedora Workstation 45
- AMD Ryzen 7 6800H
I have attached screenshots showing the newly created 19-subjob encoding job immediately after completion and after restarting Hybrid.
This appears to be a cosmetic issue rather than an encoding failure.
Thanks for your work on Hybrid!
Best regards
tamo_bln
![[Image: Bildschirmfoto-vom-2026-11-26-13-36-29.png]](https://i.postimg.cc/CnFDYV6B/Bildschirmfoto-vom-2026-11-26-13-36-29.png)

