16.10.2018, 05:05
Yes, that is the intention, in case some tools change there might be something left, but that would not be intended.
A job should also contain cleanup-subjobs for the cleaning.
In case something leaves stuff behind try to describe me how to reproduce the problem and I'll try to fix it.
Cu Selur
A job should also contain cleanup-subjobs for the cleaning.
In case something leaves stuff behind try to describe me how to reproduce the problem and I'll try to fix it.
Cu Selur