Don't really get the question.
But this hasn't changed since the job queue was introduced.
How long a single subjob took should be shown in the normal log, the report and the debug output.
(afk. atm. but it might also be saved inside the job info, once it's completed)
=> yes, one can add 'Start Time' and 'End Time' to the Jobs columns.
![[Image: Bildschirmfoto-2026-01-12-um-18-01-05.png]](https://i.ibb.co/hkbhJhM/Bildschirmfoto-2026-01-12-um-18-01-05.png)
Cu Selur
But this hasn't changed since the job queue was introduced.
How long a single subjob took should be shown in the normal log, the report and the debug output.
(afk. atm. but it might also be saved inside the job info, once it's completed)
=> yes, one can add 'Start Time' and 'End Time' to the Jobs columns.
![[Image: Bildschirmfoto-2026-01-12-um-18-01-05.png]](https://i.ibb.co/hkbhJhM/Bildschirmfoto-2026-01-12-um-18-01-05.png)
Cu Selur
----
Dev versions are in the 'experimental'-folder of my GoogleDrive, which is linked on the download page.
Dev versions are in the 'experimental'-folder of my GoogleDrive, which is linked on the download page.


