Selur's Little Message Board

Full Version: Request for a small feature
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Hi Selur !

Can you please add TOTAL TIME for Job queue,where

ID,Progress,State,Start time,End time,Call is ?!

BTW ,what is the Call item?
Thanks !
Quote:Can you please add TOTAL TIME for Job queue,where

ID,Progress,State,Start time,End time,Call is ?!
I have no idea what "TOTAL TIME" should show, so I don't even know whether it is possible or not.

Quote:BTW ,what is the Call item?
The 'call' -column shows either a short description about what a subjob does (when 'Minimize job command lines' is enabled).
[attachment=1664]
or what the used call of the subjob is (when 'Minimize job command lines' is disabled).
[attachment=1665]

Cu Selur
Oh,sorry.
Total time is the total encoding time/job.
End time-start time. Easy code.Smile
And thanks for the explanation.
That is shown in the Log tab:
For example:
Code:
starting 2022-01-19@18_54_18_7110_01_video@18:54:24.642 - E:\Output\test.mp4
2022-01-19@18_54_18_7110_01_video finished after 00:00:03.031
starting 2022-01-19@18_54_18_7110_02_muxing@18:54:27.677 - E:\Output\test.mp4
2022-01-19@18_54_18_7110_02_muxing finished after 00:00:00.191

If you want that info separately tell Hybrid to create report files. (Config->Internals->Create report file)

Cu Selur
......okay,ur right..... my wish was much convenient,but if you dont want to code it...

Thanks again.
Bye!Smile
Not seing and real gain from it, so don't count on it happening.

Cu Selur